08 January 2010

The build begins


With body back in black it was now time to reunite the chassis and body and begin the build.
What first...
The wiper rack and pinions were first as these can be a ball ache to fit when everything else is in position.Then the dreaded loom, lots to think about here as didn't want any unsightly wiring on view and taking into account that this was an Emerald powered car with relays and a totally new fuse board to make,the engine was installed at this point too as to make the (engine harness) ECU wiring fit the spitfire loom or was it the othe way round..
KD

Labels:

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home